by Troy Kirschman | Oct 28, 2022 | Uncategorized
Tips for Your Car Wash Social Media Accounts It’s common knowledge that to be successful in today’s marketplace, almost every business needs to have an online presence – and it pretty much goes without saying that an online presence means a social presence. ...
by Troy Kirschman | Oct 25, 2022 | Uncategorized
Construction Administration For the most part, the General Contractor takes over control of the project at this point – including the development of a construction schedule, bidding, staging, construction and inspections. The Project Architect, along with all...
by Troy Kirschman | Oct 12, 2022 | Uncategorized
The Building Department Review, or permitting, is the final stage of review before construction begins. This review looks specifically at the building Construction Documents (CD’s) which details the structural design, mechanical, plumbing and electrical engineering,...
by Troy Kirschman | Oct 4, 2022 | Uncategorized
Construction Documents, or CD’s, are prepared by the design team and used by the general contractor and his subcontractors to construct the building. Depending on the design of the building, this process often takes a minimum of five weeks to complete. Once the...